Fastracks train line from Union Station to the Airport

->

thinking about Induced Demand

increasing capacity may not always prove to increase utilization, if the corridor is in a complex system that has other moving parts

this may be the best argument against assuming Induced Demand is ubiquitous and inevitable

maybe Durham should provide gantt charts for all projects

Initial screening involved a lot of reality checking to reduce ~100 possible routes over the first 4-6 months in Dec 2003

Issues with signaling and satellite system at at-grade crossings