11:10

Model based program management

Tradespaces of plans

Risk is a good dimension to include

Or is risk included in cost?

GERT

Deterministic task durations

Probabilistic network flow

Boolean logic for network paths

Relatively unintuitive representation

Fly over

Projects and operations are different

Projects are unique

Waterfall is from the 70s

Born mostly from the Apollo program

Moser

Modern manufacturing is more dynamic and considerate of the individual than modern engineering

Cost, schedule, and scope at quality are outputs not inputs

Top down thinking is still rampant