Scope
Is work linear with scope?
Scope as ends
Where the best measure of scope are measures that are means that are close to the ends
Scope is not cost or schedule
Scope could be like man months
But doesn’t consider communication complications
Mythical man month
Scope vs estimation
Planning poker, COCOMO, functional point analysis
Scope as about of new content
This is something I haven’t thought much about before
For Bryan
Scope is the tangible outcome of project tasks
I think he considers scope to be a true sibling of cost and schedule, not above or below
Scope is not value or work but the basis of value and the result of work
This makes me think
Scope is the mapping from work to value
Scope attributes
Units: drawings, parts, etc
Effort: nominal hours, story points
Divisibility
Complexity, uncertainty
Target neutral
If customer target changes then value of scope changes but the scope is not changes
Resource Nominal
eg
Man months
Exception realistic
A way to describe a scope partial, imperfect, and rework
Examples of scope types Bryan saw through interviews
Fixed duration
Linear burn down
Units non linear effort
Map coverage
Some sort of spatial division
Cyclical operation
The goal is to have a scope map around which you can design your system
System Design